Aside from installing residential and commercial solar system projects, Vu Phong Solar also have industrial projects with capacity of hundreds of kWp (100+ projects) and hundreds of MWp (7 solar farms).

The lifecycle of a Solar Farm can be broken into the 4 phases:

  • Development (typically 1-3 years) : Pre-planing and Design & Engineering can be separated into 2 small phases.
  • Contruction (a few months)
  • Operation & maintenance (typically 20-35 years)
  • Dismantling or repowering (a few months)


With Vu Phong experience, we belive in providing high quality contruction, best services for customers requirements.


dautieng4

Dau Tieng Solar Power Plant 420MWp – Tay Ninh province

farm-hong-phong-2

Hong Phong Solar Power Plant 325MWp – Binh Thuan

mocbai3

Moc Bai Solar Power Plant 2x50MWp – Tay Ninh

farm-vinh-hao-1

Vinh Hao Solar Power Plant 50MWp – Binh Thuan

farm-bitexco1

Bitexco Solar Power Plant 50MWp – Ninh Thuan

farm-mui-ne4

Mui Ne Solar Power Plant 40MWp – Binh Thuan province

farm-ninh-thuan4-1

BIM2 Solar Power Plant 250MWp – Ninh Thuan province

saigon3-3

System Solar On Grid 1MWp – Dong Nai

cost-phong-phu-2

System Solar On Grid 463kWp – Ho Chi Minh

hethonnangluong1mw-ninhthuan1

System Solar On Grid 1MWp – Ninh Thuận

hoaluoidongnai1

System Solar On Grid 250kWp – Đong Nai

dienlucmientrung1

System Solar On Grid 280kWp – Mien Trung